Tomato processing plant
SALE FROM AN ACTIVE COMPANYTomato processing plant Tecnotermica power plant and Ilmed cooling towers Additional information Plant still installed Year of construction and installation 2000 Production capacity 500 tons 24 hours of incoming product returns 3500 ml h concentrated 28 30 Brix unloaded hot into approximately 220 kg drums requires reprocessing within 2 3 months or storage in cold storage Total consumption for full load operation of the entire plant Electricity 500 kW h Water cooling tower circuit replenishment only 1 5 m2 hour vacuum pump consumption and tomato washing circuit integration 4 m2 hour with evaporated water recovery consumption for washing operations 5 m2 cycle every 10 days steam generator consumption 0 5 m2 hour demineralized water replenishment Diesel steam generator burner 300 kJ h at full capacity See the PDF document Lot 1 in the documentation section for further details