Mezzanine structure including incorporated shelving
NOTES FOR COLLECTION:
- maximum time for collection activities to take place from the agreed day: 5 days
- it is recommended to have the following means for collection: Van
-It should be noted that there are goods from Lot 2 on the shelves. The collection of Lot 4 can only be carried out after the awarding and collection of Lot 2. Alternatively, the successful tenderer of Lot 4, at his own expense, can collect his own goods following storage on land of the material constituting Lot 2.