Main Group ( MainGroup ) PU208 - 30 station - dual-density ( PU / PU )
- No. 01 unit pouring for first density
- No. 01 injector for second density
- No. 04 tanks for the material ( Nr.02 Iso + Nr.02 Pol )
- No. 06 colors ( 03+ 03 )
- Year of Manufacturing : 1998
- electronic unit with PLC Siemens S7 300
- brushless engines,
- all hydraulic.
- turns automatic shapes
- carello extraction system : with the pull-out trolley you can easily perform checks of the previously cast tread, insert inserts such as TPU soles or rubber soles.
- all stations are equipped with differentiated electric heating, virtually every component of the mold has its own thermoregulated heating by electronic thermoregulators.
- all stamp holders are equipped with piston and plate for cap injections.
The machine was overhauled in 2010, without robot
without warranty