search
Lot 1

Production plant for shoe lasts

prev lot 1 out of 38 lots next lot
  • Closing date: reopening
  • Experiment n°8
  • Reserve price :
    Not met

Lot Description

Complete plant for the production of plastic last for footwear 500 pairs / day. N. 2 roughing machine donzelli SGR 180 1 pair, n. 4 paver donzelli 2 pairs 2FN70, n. 1 complete V joint system Omr RRA milling machine - Centauro band saw complete with X S device - pneumatic pin plant - vertical mortising machine, n. 1 complete zip system
n. 1 Omr 3 hole drilling machine, n. 1 Centauro saw for cutting with apparatus, n. 1 Arbo pneumatic rotary mortiser, n. 2 pneumatic pin planters, n. 1 drill bit 1 pair Omr Oleodinamica, n. 1 Arbo pneumatic bead cutter, n. 1 drill for compass 1 pair with Palser single height cutter, n. 1 manual drill + pneumatic press for bushings for samples, n. 1 milling machine set shoeing, n. 1 Torti nailer for shoeing, n. 1 clamps + pneumatic hammer for irons, n. 1 cleaner, n. 1 disk for milling, n. 1 sander, n. 1 cutter marks the upper, n. 1 circular cutter for flip flops, n. 2 Centauro band saws, 1 Arbo mini extruder, n. 1 bench for stamping, Manovia complete with manual trolleys mt. 15 and suction system electrical system with electrical panel

Lot Details

  • Closing date:30-07-2021 16:00:00
  • VAT:22%
  • Buyers Premium: 15% BP
  • Payment: Read the conditions of sale
  • Inspection date: Upon appointment
  • Payment method: Bank Transfer
  • Collection:Read the conditions of sale

Location

Related searches

  • Would you like to take a look at all court actions and bankruptcies in Veneto?
    Click on: Veneto Court Actions
  • Would you like to take a look at all court actions and bankruptcies in the area of Padova?
    Click on: Padova Court Actions