![Brick production line - Lot 1 (Auction 7883)](https://s3-eu-west-1.amazonaws.com/industrialdiscount/auctions/7883/lots/1/images/250/mdx_01.jpg)
Brick production line
Within this area there is a factory for the processing and production of perforated bricks There are several production areas that begin with an external area for crushing the material mixing and refining the base material sand and clay which takes place through crushers feed bins rolling mills mixers and all the associated conveyor belts Inside the base material enters a mixing and drawing line cutting machines conveyor lines staplers for loading platforms for entering the dryers conveyor lines to the ovens and finally machinery for strapping palletizing and storage For a fairly mechanized process that begins with the preparation of the mixture the shaping of the bricks and continues with drying cooking and ends with storage The line is still in fair condition and has been stopped since October 2021 For its possible reactivation regeneration and cleaning interventions will be necessary and in all likelihood the replacement of some mechanical parts The stocks have been inventoried within the site spare parts especially for the production line machines crowns bearings pinions PVC tapes electrical elementsREPORTS Production line in poor condition27 11 2023 following a further inspection it was found that the lot being sold had suffered vandalism and damage Interested parties are invited to carry out an on site inspectionSALES NOTES It is specified that the successful tenderer of lot 1 will have to dispose of the material present inside the warehouse where the goods are kept with costs and charges to be borne by him please consult the conditions of sale and collection We inform you that the lots offered for sale may include non CE compliant goods The person who at the end of the tender has been awarded one or more non CE compliant goods will be required to send no later than 48 hours after the end of the auction to finalizzazione industrialdiscount com consult the conditions of sale and collection NOTES FOR COLLECTION maximum time for collection activities to take place from the agreed day 90 days it is recommended to have the following means for collection crane truck